Office Space
Senna Center is a First-Class office complex with three buildings totaling 180,000 total sf of office space. Each building’s office space contains 60,000 sf spread over just two floors. Each building has an at-grade pedestrian entrance.
Parking
Each building is built over 2 levels of parking garage, containing 132 parking spaces for each floor. The site provides an additional 88 surface parking spaces. The site provides a total of 484 parking spaces.
o Located just 1.5 miles from the Hill Country Galleria and numerous other retail, dining, and recreational amenities. Park-like setting nestled at the confluence of major thoroughfares SH 71, RR
620, and FM 2222.
o Underground/ covered parking for all employees.
o Complete athletic facility with showered locker rooms for campus employees and tenants.
o Common/ private conference center facility for tenant use on an RSVP basis.
o Outdoor Jogging trail of approximately 1.25 miles.
o Multiple water features throughout the facility.
o Solar panel array on all buildings for the benefit of the project.
o Rainwater collection facilities in multiple locations for landscape irrigation.
o Geo-thermal HVAC and heated potable water system to lower utility costs and show environmental sensitivity. This is still being engineered and subject to change.
o Secured elevated walkways in order to expedite access between buildings w/o leaving secured area(s).
o 100% on site rainwater filtration, detention and irrigation of all runoff to achieve 0% pollutant runoff into neighboring Barton Creek.
o 100% down lighting in the surface parking lots to eliminate the “halo” effect of up lighting for the area and surrounding neighborhood(s).
o Exterior and interior common area music system to create a “soft” environment in covered and surface parking areas and in all common areas.
o Brick pavers for all driveway areas in leu of asphalt and or concrete.
o Senna Hills, Ltd. will also retain the ON-SITE management of the project as they have a complete management and maintenance team in place:
Management team includes a licensed HVAC professional, plumbing professional, electrical professional, welding professional, wood working professional, irrigation professional, and
numerous landscaping professionals.
On-site 7:00 am to 5:30 pm on call response time is typically less than 15 minutes.
After hours on call response time is typically 1-2 hours depending on the time of the call.
There will also be nightly security patrolling by off-duty or retired law enforcement professionals currently on staff.